Engineered for hot-chamber and cold-chamber HPDC operations across Bursa, Kocaeli, and Izmir industrial zones, designed to withstand extreme thermal cycle shocks.




Strategic engineering analysis of Turkey's rapidly expanding casting foundry network and component manufacturing requirements.
Turkey stands as Europe's fourth-largest automotive producer. Industrial clusters centered in Marmara, Bursa, and Kocaeli require severe thermal-shock-resistant die components to manufacture lightweight aluminum powertrain enclosures, transmission blocks, and structural crossmembers without unplanned mold downtime.
Operating as a global export center for domestic major appliances, Turkey’s white goods industry commands precision zinc and magnesium die-cast parts with flawless Ra 0.2 µm mirror surface finishes, necessitating high-yield gate bushes and distortion-free core pins.
With domestic EV programs such as TOGG and Tier-1 structural battery tray production scaling in Central Anatolia, Turkish foundries are pivoting aggressively toward structural gigacasting. These massive thin-walled castings demand ultra-precise tool alignment, venting systems, and booster pumps.
Combining high-grade hot-work tool steels (1.2343 ESR, 1.2344, Dievar equivalents) with state-of-the-art multi-axis CNC turn-mill infrastructure.
Our die casting components undergo vacuum heat treatment, multi-stage cryogenic tempering, and physical vapor deposition (PVD) coating (AlCrN, TiAlN). This suppresses heat checking, solder development, and aluminum wash-out common in continuous 680°C casting cycles.
We eliminate internal shrinkage porosity in heavy wall transitions of die castings by deploying integrated pneumatic and gas-liquid booster pumps. These units drive hydraulic wedge intensification cores, delivering consistent localized pressure up to 7,000 kgf.
Configured for smooth Turkish import compliance, providing ATR certificate documentation, strict EUR-pallet packaging, and clear material test reports (MTR according to EN 10204 3.1) directly to Istanbul, Mersin, and Izmir ports.
Comprehensive standard tooling and high-cycle replacement modules ready for supply to Turkish precision toolmakers and foundries.








Clear, direct answers regarding tool life expectancy, import arrangements, material certifications, and custom tooling integration.
We primarily utilize premium-grade certified hot-work tool steels including DIN 1.2343 ESR, DIN 1.2344 ESR, AISI H13 (Premium Grade), and proprietary equivalents engineered for superior high-temperature fracture toughness. Every batch includes full chemical composition and ultrasonic flaw detection reports per EN 10204 3.1 standards to guarantee no micro-inclusions during thermal cycling.
Our pneumatic and gas-liquid booster pumps (e.g., SWP and SWB series) are engineered to amplify existing factory air networks up to 8:1 and higher ratios. This pressurized force operates auxiliary core-pull cylinders, high-pressure local pin squeeze systems to combat shrinkage porosity in thick sections, and in-mold trimming mechanisms directly before mold opening, reducing cycle times.
Standard replacement items and catalog air booster pumps ship within 5 to 7 business days. Custom non-standard components (ejector sleeves, stepped core pins, shot sleeve components, cavity sub-inserts) typically require 12 to 20 business days depending on geometric complexity and PVD coating requirements. Air-freight options to Istanbul Airport (IST/SAW) take 3-5 days, while ocean freight routes to Ambarli, Gebze, or Izmir take approximately 22-28 days.
Yes. We regularly produce die casting and mold components adhering to metric DIN, HASCO, DME-Europe, and JIS standards. Furthermore, our 5-axis CNC machining centers and wire-EDM departments routinely handle fully non-standard, custom-engineered components fabricated strictly to your 3D CAD models (STEP, IGES, X_T) and technical drawings with tolerances controlled to ±0.002 mm.
Send your CAD models or detailed replacement part specifications to our engineering team today. Benefit from direct manufacturer pricing, international metallurgical certifications, and rapid lead times.
Send Inquiry Now